Everybody in ground-based construction needs to look to the sky: Aviation lawyer
Everybody in ground-based construction needs to look to the sky: Aviation lawyer
Rebranding Portland cement reflects industry shift from carbons
Universal Rail acquires Oakville’s Condor Signals and Communications
‘We’re going to have to get creative with solutions,’ states Ferreira
FLOOR FINISH RENOVATION PROJECT FOR BREBEUF COLLEGE CATHOLIC SCHOOL $100,000 est
ST. MARY CATHOLIC ELEMENTARY SCHOOL LANDSCAPE WORKS $200,000 est
ABATEMENT, GYMNASIUM RIGID CEILING REPLACEMENT AT DOVERCOURT PUBLIC SCHOOL $100,000 est
ST. CATHERINE CATHOLIC SCHOOL WASHROOM RENOVATIONS $100,000 est
EXTERIOR WALL REPAIR MADONNA CATHOLIC SECONDARY SCHOOL $100,000 est
SPRINKLER SYSTEM UPGRADES TO VARIOUS LOCATIONS WITHIN THE REGION OF PEEL $2,000,000 est
FLOOR FINISH RENOVATION PROJECT FOR ST. THOMAS AQUINAS CATHOLIC SCHOOL $100,000 est
NEW CONSTRUCTION OF THE BARRIE FIRE AND EMERGENCY SERVICE STATION 6 $2,500,000 est
FATHER MICHAEL GOETZ HEAT PUMP AND HRU REPLACEMENT $100,000 est
BAYVIEW DRIVE NEW TRANSMISSION WATERMAIN AND ROAD RECONSTRUCTION $2,500,000 est
ST. ALPHONSUS CATHOLIC SCHOOL STAIRS AND STAIRWELL RENOVATION $100,000 est
ST. CATHERINE CATHOLIC SCHOOL WASHROOM RENOVATIONS $100,000 est
RFQ CONTRACTOR - BOX GROVE COMMUNITY HOUSING DEVELOPMENT $50,000,000 est
KINDERGARTEN CLASSROOM AND GIRLS WASHROOM RENEWAL $100,000 est
STAYNER COLLEGIATE INSTITUTE - INTERIOR RENOVATION $250,000 est
ST. MOTHER TERESA CATHOLIC ACADEMY FLOORING UPGRADES RENOVATION $200,000 est
GREATER TORONTO AREA CONTRACTOR VILLAGE - PHASE 1 RE-TENDER $3,000,000 est
ABATEMENT FOR SIPOREX DECK AND ROOF REPLACEMENT AT KINGSLAKE PUBLIC SCHOOL $100,000 est
WASAGA BEACH WATER POLLUTION CONTROL PLANT CLARIFIERS REFURBISHMENT $200,000 est
ST. JOHN BOSCO CATHOLIC SCHOOL WASHROOM RENOVATIONS $100,000 est
BIO-TECHNE RENOVATION $600,000 est TORONTO, Toronto, ON 21 Canmotor Ave, Toronto, M8Z 4E6
GENERAL CONTRACTING SERVICES FOR KINSMEN HALL UPGRADES $500,000 est
ROOF REPLACEMENT PROJECT ST. BARNABAS CATHOLIC SCHOOL $200,000 est
WASAGA BEACH WATER POLLUTION CONTROL PLANT CLARIFIERS REFURBISHMENT $200,000 est
ST. KEVIN CATHOLIC SCHOOL EXISTING ROOF REPLACEMENT AND CHIMNEY RESTORATION PROJECT $150,000 est
MISSISSAUGA FIRST NATION, SOCIAL SERVICES BUILDING, BLIND RIVER $1,000,000 est
COLLINGWOOD WASTE WATER TREATMENT PLANT PRIMARY DIGESTER REPAIR $200,000 est
REPLACEMENT OF BUS WASH FOR DURHAM REGION TRANSIT AT 110 WESTNEY ROAD $430,000 est
RFQ CONTRACTOR - THREE NEW ELEMENTARY SCHOOLS STAGE 1 $53,700,000 est
ST. JOSEPH’S CATHOLIC HIGH SCHOOL INTERIOR STAIRS REPLACEMENT 2003 ADDITION $200,000 est
JIM TOVEY LAKEVIEW CONSERVATION AREA BRIDGES AND BOARDWALK CONSTRUCTION $500,000 est
BAYVIEW DRIVE NEW TRANSMISSION WATERMAIN AND ROAD RECONSTRUCTION $2,500,000 est
JIM TOVEY LAKEVIEW CONSERVATION AREA BRIDGES AND BOARDWALK CONSTRUCTION $500,000 est
RFP D/B - PLAY COURT CONSTRUCTION AND PARK SITE WORKS $600,000 est
LOCAL ROADS RESURFACING IN WARDS 1, 2, 3, 4, 5 AND 8 $1,000,000 est
SHIP CHANNEL BRIDGE REHABILITATION - ELECTRICAL, MECHANICAL AND STRUCTURAL $10,000,000 est
REPAIR OF STRUCTURE 1 - SIXTH LINE SOUTH AT STEELES AVENUE $300,000 est
RFP D/B - INTERSECTION CAMERAS WITHIN THE CITY OF BRAMPTON $100,000 est
ROAD RESURFACING DOUBLE SURFACE TREATMENT AND HL3 HOT MIX ASPHALT PAVING $1,000,000 est
IWSD/IS/DCFB CF000571 ROPEC SECONDARY CLARIFIERS REHABILITATION PHASE 2 $500,000 est
VARIOUS ARCHITECTURAL AND ELECTRICAL RENEWALS - C SAINT-ANNE & ESC LISABETH-BRUYRE $500,000 est
ROOF REPLACEMENT AT COLE LMENTAIRE PUBLIQUE LE PRLUDE $200,000 est
WESTMINSTER PUBLIC SCHOOL - PORTABLE CLASSROOM REMOVAL PREPARATION $50,000 est
COLLINGWOOD WASTE WATER TREATMENT PLANT PRIMARY DIGESTER REPAIR $200,000 est
IWS/IW/DCFB CF000595 GLEBE COMMUNITY CENTRE HALL FLOORING REPLACEMENT II $100,000 est
ROAD RESURFACING DOUBLE SURFACE TREATMENT AND HL3 HOT MIX ASPHALT PAVING $1,000,000 est
DR M.S. HAWKINS PUBLIC SCHOOL CLASSROOM UPGRADES $200,000 est
ISW DCFB CF001056 OC TRANSPO BLAIR STATION ELEVATOR UPGRADES $100,000 est
PEMBROKE ARMOURY ENERGY UPGRADES PETAWAWA, ONTARIO $893,000 est
BELLEVILLE PUBLIC LIBRARY ACCESSIBILITY IMPROVEMENTS $100,000 est
RFP CONTRACTOR - FAIRFIELD WATER TREATMENT PLANT WALL AND ROOF REHABILITATION $100,000 est
FILTER UNDERDRAIN INSTALLATION TRENTON WATER TREATMENT PLANT $400,000 est
SUPPLY AND INSTALLATION OF NEW OUTDOOR BLEACHER SYSTEMS $50,000 est
REFLOORING OF THE 6TH, 4TH, AND 2ND SOUTH FLOORS $200,000 est
POOL SIDE CHANGE ROOMS FLOORING REPLACEMENT AT THE JACK BURGER SPORTS COMPLEX $300,000 est
RFP D/B - MARINA FUEL PUMPS REPLACEMENT AND UNDERGROUND FUEL TANK REMOVAL $100,000 est
QUEEN’S UNIVERSITY - JOSEPH S. STAUFFER LIBRARY MAIN FLOOR RENOVATION $1,500,000 est
HEATING PLANT UPGRADE - M.T. DAVIDSON PUBLIC SCHOOL $200,000 est
RFP D/B - MARINA FUEL PUMPS REPLACEMENT AND UNDERGROUND FUEL TANK REMOVAL $100,000 est
ROOF REPLACEMENT AT NORTH ADDINGTON EDUCATION CENTRE $200,000 est
LABRECHE DRIVE AND BLAIR STREET UNDERGROUND REBUILD $1,000,000 est
IWS/IS/DCM/CP000923 - 2024 GRAVEL RD UPGRADE, AND PAVEMENT PRESERVATION PROGRAMS $1,000,000 est
ROOF REPLACEMENT AT NORTH ADDINGTON EDUCATION CENTRE $200,000 est
REHABILITATION OF COUNTRY STRUCTURE C268 (ST. COLUMBKILLES CULVERT) $100,000 est
TSD/TBOM/TFMB TFFM2023-05 UOTTAWA TRENCH DRAIN REPLACEMENT AND SLOPE DRAINAGE I $500,000 est
HIGHWAY 11 - GRADING, HOT MIX PAVING, STRUCTURAL REHABILITATION $3,000,000 est
IWS/WLC/SM/SW-12056-24 VILLAGE GREEN AND KANATA TOWN CENTRE POND CLEANOUT $100,000 est
PROPOSAL - SUPPLY AND INSTALLATION OF MARINA BREAKWATER SYSTEM - TRENT PORT MARINA $500,000 est
330 KING STREET WATERLINE REPLACEMENT AND PARKING LOT EXPANSION $500,000 est
RFP D/B - MARINA FUEL PUMPS REPLACEMENT AND UNDERGROUND FUEL TANK REMOVAL $100,000 est
REHABILITATION OF COUNTY ROAD 65 (CENTENNIAL LAKE ROAD) $550,000 est
HIGHWAY 11 - GRADING, HOT MIX PAVING, STRUCTURAL REHABILITATION $3,000,000 est
RIVERSIDE DRIVE BACKWASH FORCEMAIN UPGRADES (0.5KM) $500,000 est
HIGHWAY 417 - RESURFACING, PAVEMENT MARKING AND LOOP DETECTORS $500,000 est
HIGHWAY 417 - RESURFACING, LOOP DETECTORS, PAVEMENT MARKINGS $500,000 est
PROPOSAL - SUPPLY AND INSTALLATION OF MARINA BREAKWATER SYSTEM - TRENT PORT MARINA $500,000 est
OFFICE RENOVATIONS - LEAMINGTON POLLUTION CONTROL AND WATER SERVICES $200,000 est
GRAND RIVER COLLEGIATE INSTITUTE UNIVERSAL WASHROOM AND FASHION RENOVATION $200,000 est
HEIDELBERG LONG TERM WATER SERVICING PHASE 1: LOBSINGER LINE 150MM WATERMAIN PROJECT $2,000,000 est
WATERLOO-OXFORD DISTRICT SECONDARY SCHOOL - FAMILY STUDIES RENOVATION AND HVAC UPGRADES $300,000 est
RFP - ROSE CITY SHOPPING CENTRE - CRU RETAIL BUILDINGS 3 AND 4 / WINDSOR $4,700,000 est
ST. MARY’S CATHOLIC HIGH SCHOOL EXTERIOR ALTERATIONS $200,000 est
MACGREGOR SENIOR PUBLIC SCHOOL PHASE 4 HVAC NORTH WING & BOILER UPGRADE $300,000 est
TILLSONBURG COMMUNITY CENTRE INDOOR POOL MECHANICAL ROOM UPGRADE $100,000 est
WATERLOO-OXFORD DISTRICT SECONDARY SCHOOL - FAMILY STUDIES RENOVATION AND HVAC UPGRADES $300,000 est
W.J. BAIRD ROOF RESTORATION AND WINDOW REPLACEMENT $350,000 est
RESTORATION OF EXTERIOR WALLS AT OUR LADY OF MOUNT CARMEL CATHOLIC ELEMENTARY SCHOOL $100,000 est
GREENWAY WASTEWATER TREATMENT PLANT (WWTP) FLOOD PROTECTION $20,000,000 est
WINDOW REPLACEMENT AT 185 JACKSON STREET EAST, HAMILTON FOR CITYHOUSING HAMILTON $700,000 est
RESTORATION OF EXTERIOR WALLS AT OUR LADY OF MOUNT CARMEL CATHOLIC ELEMENTARY SCHOOL $100,000 est
CANADA GAMES AQUATIC CENTRE REPLACEMENT WOMAN’S CHANGE ROOM LOCKERS $50,000 est
SUPPLY, DELIVERY AND INSTALLATION OF 2 BACKUP GENERATORS FOR THE TRUNKED RADIO SYSTEM $100,000 est
WINDOW AND EXTERIOR DOOR REPLACEMENT AT RIVER HEIGHTS SCHOOL $100,000 est
HEIDELBERG LONG TERM WATER SERVICING PHASE 1: LOBSINGER LINE 150MM WATERMAIN PROJECT $2,000,000 est
BRIDGE STRUCTURE REHABILITATIONS NOS. 044180 AND 135018 $600,000 est
ASPHALT RECONSTRUCTION - ST. CECILIA SCHOOL, PORT DOVER $300,000 est
HOT-MIX ASPHALT RESURFACING PROGRAM - TILBURY AND WHEATLEY $200,000 est
ARKONA WATER TOWER IMPROVEMENTS MUNICIPALITY OF LAMBTON SHORES $200,000 est
BRIDGE STRUCTURE REHABILITATIONS NOS. 044180 AND 135018 $600,000 est
RFP - MYERS ROAD RAMP TO CALIFORNIA ROAD CONSTRUCTION SERVICES, CITY OF CAMBRIDGE $1,000,000 est
DELAWARE COMMUNITY CENTRE LOWER PARKING LOT ASPHALT REPLACEMENT $100,000 est
2024 ROAD AND WATERMAIN II - TECUMSEH ROAD EAST $5,000,000 est
KING GEORGE VI PUBLIC SCHOOL - SARNIA FULL DAY KINDERGARTEN PLAYGROUND $100,000 est
1415 CAISTOR-GAINSBOROUGH TOWNLINE ROAD WETLAND RESTORATION PROJECT $500,000 est
ANNUAL GUIDE RAIL IMPROVEMENT PROGRAM ON REGIONAL ROADS $100,000 est
RFP CONTRACTOR - CONNAUGHT PARK BALL DIAMOND LIGHTING $100,000 est
ECOLE SECONDAIRE LOREE DES BOIS - HEAT PUMPS 2024 $50,000 est
ELLIOT LAKE SECONDARY SCHOOL COURTYARD RETAINING WALL $500,000 est
CENTRAL MANITOULIN PUBLIC SCHOOL WASHROOM UPGRADES $100,000 est
ECOLE PUBLIQUE JEAN-ETHIER-BLAIS - DRY SPRINKLER SYSTEM UPGRADES (ATTIC SPACE) - 2024 $200,000 est
TIMMINS HIGH AND VOCATIONAL SCHOOL CHEMICAL STORAGE VENTILATION $100,000 est
HAZARDOUS MATERIALS ABATEMENT SERVICES - PIC RIVER ELEMENTARY SCHOOL/TEACHERAGE $200,000 est
SOCIAL SERVICES BUILDING MISSISSAUGA FIRST NATIONS $3,000,000 est
ECOLE SECONDAIRE LOREE DES BOIS - HEAT PUMPS 2024 $50,000 est
MANITOU RIVER (ESOX LAKE) DAM CONCRETE REHABILITATION $1,000,000 est
HIGHWAY 17 - HOT MIX PAVING, GRADING, AND STRUCTURAL $4,000,000 est
RFP D/B - NEW LISKEARD PUBLIC SCHOOL PLAYGROUND $155,000 est
ROOF REPLACEMENT (A, E, F5) AT PLEASANT VIEW MIDDLE SCHOOL $300,000 est
ERNEST CUMBERLAND ELEMENTARY SCHOOL - ROOF REPLACEMENT $665,860 est
DUFFERIN OAKS - ROOFING REPAIRS AND REPLACEMENTS $1,766,586 est
MAIN OFFICE INTERIOR FINISHES AND LIGHT REPLACEMENT AT VALLEYFIELD JUNIOR SCHOOL $300,000 est
ROOF REPLACEMENT (A, B1, D) AT DR NORMAN BETHUNE COLLEGIATE INSTITUTE $300,000 est
INTEGRATED PA/IN-HOUSE PHONE SYSTEM REPLACEMENT AT YORKDALE SECONDARY SCHOOL $200,000 est
SEWELLS ROAD RESIDENTIAL BUILDING BUILDING A $65,000,000 est
REPLACEMENT OF SUBWAY VENTILATION CONTROL PANEL SVCP-03 $146,732 est
RFP - NEW LITTLE LAKE SUBSTATION CONSTRUCTION SERVICES $5,000,000 est
Building BELA SQUARE - MIXED-USE RENTAL BUILDINGS $72,500,000 est
AFFORDABLE HOUSING PROJECT AT MORRIS GLEN COURT - MORRISBURG $7,997,175 est
SIMCOE STREET (REGIONAL ROAD 2) REHABILITATION IN THE TOWNSHIP OF SCUGOG $2,075,979 est
DUNDAS STREET WEST RETAINING WALLS AT TWO LOCATIONS $9,047,785 est
ROAD REHABILITATION AT MARSH HARBOUR ET AL (12 STREETS) $4,125,250 est
CRYSTAL RIDGE STEEL CORRUGATED ROOF REPLACEMENT PROJECT $649,500 est
HOT MIX OVERLAY 1 COUNTY ROAD 26 (MANDAUMIN ROAD) $757,400 est
CENTRE WELLINGTON NEIGHBOURHOOD ELEMENTARY SCHOOL $14,082,000 est
LCBO - RECEIVING TRUCK YARD ASPHALT REPLACEMENT - LONDON RETAIL SERVICE CENTRE $602,980 est
REHABILITATION OF BRIDGE 113 ON SULPHUR SPRINGS ROAD $1,161,668 est
PERTH LINE 86 - ROAD RESURFACING HOTMIX ASPHALT PAVING $1,188,000 est
PAVEMENT MARKINGS - LONGITUDINAL AND HAND / ZONE PAINT $173,180 est
2024 BOWSLAUGH AND ELM TREE BRIDGE REHABILITATION $283,000 est
PROPOSAL - ADVANCED METERING INFRASTRUCTURE (AMI) SMARTPOINT INSTALLATION $100,000 est